A platform for research: civil engineering, architecture and urbanism
Pennsylvania constructs engine terminal at Harrisburg
$2,000,000 project completed in connection with extension of electrification to this point; obsolete units replaced; new structure includes 30-stall engine house, machine shop, 2-track concrete wash table, 3-track ashpit layout, two concrete inspection pits, 2 concrete work pits, storehouse and locker building, four 50, 000-gal steel water tanks, employees' buildings, etc. (see also Ry Elec Engr v 30 n 2 Feb 1939 p 25-31; Ry Mech Engr v 113 n 3 Mar 1939 p 101-4)
Pennsylvania constructs engine terminal at Harrisburg
$2,000,000 project completed in connection with extension of electrification to this point; obsolete units replaced; new structure includes 30-stall engine house, machine shop, 2-track concrete wash table, 3-track ashpit layout, two concrete inspection pits, 2 concrete work pits, storehouse and locker building, four 50, 000-gal steel water tanks, employees' buildings, etc. (see also Ry Elec Engr v 30 n 2 Feb 1939 p 25-31; Ry Mech Engr v 113 n 3 Mar 1939 p 101-4)
Pennsylvania constructs engine terminal at Harrisburg
Ry Age
Railway Age ; 105
1938
6 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Pennsylvania Higher Education Assistance Agency Harrisburg, Pennsylvania
British Library Online Contents | 1995
|Paxton creek flood controlling works, Harrisburg, Pennsylvania
Engineering Index Backfile | 1909
|