A platform for research: civil engineering, architecture and urbanism
Description of $40,000,000 multi-purpose development for hydroelectric power, flood control, land reclamation and waterway connecting Georgetown and Charleston; features of dams and dikes for two reservoirs, 180,000-kva power plant, etc; timber salvage; population resettlement; malaria control.
Description of $40,000,000 multi-purpose development for hydroelectric power, flood control, land reclamation and waterway connecting Georgetown and Charleston; features of dams and dikes for two reservoirs, 180,000-kva power plant, etc; timber salvage; population resettlement; malaria control.
Santee-Cooper project, South Carolina
Civ Eng (NY)
Markwell, K. (author)
1939
4 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.