Cross Steamplant at Santee-Cooper Project No. 199, South Carolina. Final Environmental Impact Statement
South Carolina Public Service Authority (Applicant) is proposing to construct and operate a four-unit coal-fired steam electric generating plant (1800 MWe total) at a site located adjacent to the Diversion Canal connecting Lakes Marion and Moultrie, of the licensed Santee-Cooper Hydroelectric Project, FERC No. 199, in Berkeley County, South Carolina. This action would require the construction of intake and discharge structures across Project No. 199 land and into the canal and the withdrawal of up to 37.5 mgd from the canal, the construction of a 10.5-mile rail spur, and approximately 180 miles of new and widened transmission corridors. Construction would commence in 1980, and be completed in 1988. 113 references, 41 figures, 51 tables. (ERA citation 09:019646)
Cross Steamplant at Santee-Cooper Project No. 199, South Carolina. Final Environmental Impact Statement
South Carolina Public Service Authority (Applicant) is proposing to construct and operate a four-unit coal-fired steam electric generating plant (1800 MWe total) at a site located adjacent to the Diversion Canal connecting Lakes Marion and Moultrie, of the licensed Santee-Cooper Hydroelectric Project, FERC No. 199, in Berkeley County, South Carolina. This action would require the construction of intake and discharge structures across Project No. 199 land and into the canal and the withdrawal of up to 37.5 mgd from the canal, the construction of a 10.5-mile rail spur, and approximately 180 miles of new and widened transmission corridors. Construction would commence in 1980, and be completed in 1988. 113 references, 41 figures, 51 tables. (ERA citation 09:019646)
Cross Steamplant at Santee-Cooper Project No. 199, South Carolina. Final Environmental Impact Statement
1980
297 pages
Report
No indication
English
Environmental Studies , Environmental Impact Statements , Electric Power Production , Fossil-Fuel Power Plants , Air Quality , Coal , Cost Benefit Analysis , Environmental Impacts , Land Use , Rivers , Socio-Economic Factors , South Carolina , Stack Disposal , Water Quality , ERDA/010900 , ERDA/530300 , ERDA/520000 , ERDA/500200 , ERDA/290300
Santee-Cooper project, South Carolina
Engineering Index Backfile | 1939
|Santee-cooper construction operations
Engineering Index Backfile | 1940