A platform for research: civil engineering, architecture and urbanism
The rate of hydration of cement clinker
Part II: Standard portland-cement particles were found to be approaching apparently complete hydration in 9 months while at 12 months hydration was practically finished. Part III: Hydration rate of tricalcium aluminate was found quite high, particles of dimension of 25 microns being three-quarters hydrated in 3 hours; tricalcium-silicate particles required 7 days for similar degree of hydration while with dicalcium silicate this amount of hydration was reached after 5.5 months. (See also Am. Soc. Testing Matls. -- Advance Paper No. 63, for mtg. June 23-27, 1930 7 pp., 2 figs)
The rate of hydration of cement clinker
Part II: Standard portland-cement particles were found to be approaching apparently complete hydration in 9 months while at 12 months hydration was practically finished. Part III: Hydration rate of tricalcium aluminate was found quite high, particles of dimension of 25 microns being three-quarters hydrated in 3 hours; tricalcium-silicate particles required 7 days for similar degree of hydration while with dicalcium silicate this amount of hydration was reached after 5.5 months. (See also Am. Soc. Testing Matls. -- Advance Paper No. 63, for mtg. June 23-27, 1930 7 pp., 2 figs)
The rate of hydration of cement clinker
Concrete
Anderegg, F.O. (author) / Hybbell, D.S. (author)
Concrete ; 37
1930
3 pages
2 Figs.
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
The rate of hydration of cement clinker
Engineering Index Backfile | 1929
|Simulation on Hydration of Tricalcium Silicate in Cement Clinker
Springer Verlag | 2024
|Interaction between Slag and Clinker during Cement Hydration Process
Trans Tech Publications | 2013
|Simulation on hydration of tricalcium silicate in cement clinker
TIBKAT | 2024
|