A platform for research: civil engineering, architecture and urbanism
Steel cores for four-story concrete building collapse during erection
Derrick being dismantled on new Gottfield bakery building in New York falls, dragging all columns on 100 by 225 ft. site to ground; description of accident. (See also Eng. News-Rec vol. 104, no. 22, May 29, 1930 pp. 909-910, 2 figs)
Steel cores for four-story concrete building collapse during erection
Derrick being dismantled on new Gottfield bakery building in New York falls, dragging all columns on 100 by 225 ft. site to ground; description of accident. (See also Eng. News-Rec vol. 104, no. 22, May 29, 1930 pp. 909-910, 2 figs)
Steel cores for four-story concrete building collapse during erection
Am. Contractor
1930
1 Fig.
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Simultaneous steel erection and basement excavation on 40-story building
Engineering Index Backfile | 1929
|The erection of a Five story Office Building in Composite Steel Construction
British Library Online Contents | 1996
|Cast iron cores. cast-iron cores used on columns of 16-story concrete building
Engineering Index Backfile | 1929
Skyscraper steel erection in RCA building
Engineering Index Backfile | 1932