A platform for research: civil engineering, architecture and urbanism
STEEL FRAME ERECTION METHOD OF BUILDING
PROBLEM TO BE SOLVED: To provide a steel frame erection method capable of inexpensively and surely curing a work space when erecting a steel frame by a node-layering method.SOLUTION: A steel frame erection method of a building comprises a Step S1 of temporarily fixing this erected steel frame member by precedently erecting the steel frame member of a column 10 and a girder 11 of a predetermined node with 3 layers of the building 1 as one node, a Step S2 of regularly fixing together with the precedently erected steel frame member by installing a residual steel frame member of a work space S by arranging a protective barrier 20 on an outer peripheral side surface of the work space S with the (n)-floor of the lowest layer of the predetermined node as the work space S and Steps S3-S5 of repeating regularly fixing work toward an upper layer from a lower layer together with the precedently erected steel frame member by installing the residual steel frame member of a new work space S with a layer just above the work space S as the new work space S by moving the protective barrier 20 upward by one layer.SELECTED DRAWING: Figure 8
【課題】節積層工法により鉄骨建方を行う場合に、低コストで作業空間を確実に養生できる、鉄骨建方方法を提供すること。【解決手段】建物の鉄骨建方方法は、建物1の3層を一節として、所定の節の柱10および大梁11の鉄骨部材の建方を先行して行い、この建て込んだ鉄骨部材を仮固定するステップS1と、所定の節の最下層のn階を作業空間Sとし、作業空間Sの外周側面に防護壁20を配置し、作業空間Sの残りの鉄骨部材を取り付けて、先行して建て込んだ鉄骨部材とともに本固定するステップS2と、防護壁20を一層分上方に移動して、作業空間Sの直上の層を新たな作業空間Sとし、新たな作業空間Sの残りの鉄骨部材を取り付けて、先行して建て込んだ鉄骨部材とともに本固定する作業を、下層から上層に向かって繰り返すステップS3〜S5と、を備える。【選択図】図8
STEEL FRAME ERECTION METHOD OF BUILDING
PROBLEM TO BE SOLVED: To provide a steel frame erection method capable of inexpensively and surely curing a work space when erecting a steel frame by a node-layering method.SOLUTION: A steel frame erection method of a building comprises a Step S1 of temporarily fixing this erected steel frame member by precedently erecting the steel frame member of a column 10 and a girder 11 of a predetermined node with 3 layers of the building 1 as one node, a Step S2 of regularly fixing together with the precedently erected steel frame member by installing a residual steel frame member of a work space S by arranging a protective barrier 20 on an outer peripheral side surface of the work space S with the (n)-floor of the lowest layer of the predetermined node as the work space S and Steps S3-S5 of repeating regularly fixing work toward an upper layer from a lower layer together with the precedently erected steel frame member by installing the residual steel frame member of a new work space S with a layer just above the work space S as the new work space S by moving the protective barrier 20 upward by one layer.SELECTED DRAWING: Figure 8
【課題】節積層工法により鉄骨建方を行う場合に、低コストで作業空間を確実に養生できる、鉄骨建方方法を提供すること。【解決手段】建物の鉄骨建方方法は、建物1の3層を一節として、所定の節の柱10および大梁11の鉄骨部材の建方を先行して行い、この建て込んだ鉄骨部材を仮固定するステップS1と、所定の節の最下層のn階を作業空間Sとし、作業空間Sの外周側面に防護壁20を配置し、作業空間Sの残りの鉄骨部材を取り付けて、先行して建て込んだ鉄骨部材とともに本固定するステップS2と、防護壁20を一層分上方に移動して、作業空間Sの直上の層を新たな作業空間Sとし、新たな作業空間Sの残りの鉄骨部材を取り付けて、先行して建て込んだ鉄骨部材とともに本固定する作業を、下層から上層に向かって繰り返すステップS3〜S5と、を備える。【選択図】図8
STEEL FRAME ERECTION METHOD OF BUILDING
建物の鉄骨建方方法
SHISHIDO KATSUSHI (author) / KAWAGUCHI KENJI (author) / KATO HIROSHI (author) / KEMMOCHI TOMOAKI (author)
2017-11-30
Patent
Electronic Resource
Japanese
IPC:
E04G
SCAFFOLDING
,
Baugerüste
Derrick travelers adapted to steel-frame building erection
Engineering Index Backfile | 1932
Operation frame for building construction and erection method thereof
European Patent Office | 2021
|Skyscraper steel erection in RCA building
Engineering Index Backfile | 1932
Erection of steel frame buildings at Gary, Ind
Engineering Index Backfile | 1910