A platform for research: civil engineering, architecture and urbanism
Renewal of Folkestone Harbour swing bridge
New bridge has three main longitudinal steel girders, each of outer girders being made up of two end portions and center portion; bridge revolves on 24 cast-steel taper rollers; operations necessary for freeing and refixing bridge are effected by hand; bridge replaces old wooden bridge, and replacement was carried out during week-end of May 10-12, 1930. (16 figs partly on supp. plate and 624.)
Renewal of Folkestone Harbour swing bridge
New bridge has three main longitudinal steel girders, each of outer girders being made up of two end portions and center portion; bridge revolves on 24 cast-steel taper rollers; operations necessary for freeing and refixing bridge are effected by hand; bridge replaces old wooden bridge, and replacement was carried out during week-end of May 10-12, 1930. (16 figs partly on supp. plate and 624.)
Renewal of Folkestone Harbour swing bridge
Engineer
Engineer ; 150
1930
16 Figs.
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Replacement of the Folkestone harbour swing bridge
Engineering Index Backfile | 1930
VIEWFINDER - Folkestone Triennial
Online Contents | 2008
British Library Online Contents | 1997
Engineering Index Backfile | 1956
The Folkestone Bed Sands: microfabric and strength
British Library Online Contents | 1999
|