A platform for research: civil engineering, architecture and urbanism
Sheet concrete pavement placed on ambassador bridge approaches
Project which includes 60,000 sq. yd. of concrete pavement and 8000 sq. yd. of sidewalk; pavement placed in rectangular sections; finishing wearing surface.
Sheet concrete pavement placed on ambassador bridge approaches
Project which includes 60,000 sq. yd. of concrete pavement and 8000 sq. yd. of sidewalk; pavement placed in rectangular sections; finishing wearing surface.
Sheet concrete pavement placed on ambassador bridge approaches
Concrete
Concrete ; 36
1930
3 pages
6 Figs.
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1928
|Engineering Index Backfile | 1929
|Construction of the Ambassador bridge
Engineering Index Backfile | 1929
|Beam tests of pavement concrete placed by two methods
Engineering Index Backfile | 1928
|Ambassador bridge over the Detroit river
Engineering Index Backfile | 1929