A platform for research: civil engineering, architecture and urbanism
Construction problems of lake union bridge substructure
Report on construction of concrete bridge pier having base 99 ft. long, 64 ft. wide, and 33 ft. deep; in 64 ft. of water; driving of sheet piling; design of struts and wales; plan of cofferdams; jetting equipment; pile driving; pier excavation; leads and gunwales for driving 100 to 130 ft. Douglas fir piles; concreting.
Construction problems of lake union bridge substructure
Report on construction of concrete bridge pier having base 99 ft. long, 64 ft. wide, and 33 ft. deep; in 64 ft. of water; driving of sheet piling; design of struts and wales; plan of cofferdams; jetting equipment; pile driving; pier excavation; leads and gunwales for driving 100 to 130 ft. Douglas fir piles; concreting.
Construction problems of lake union bridge substructure
West. Construction News
Crocker, G.W. (author)
1930
5 pages
8 Figs.
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Substructure and approaches of lake St. Louis bridge
Engineering Index Backfile | 1934
|George Washington Bridge: Construction of Substructure
ASCE | 2021
|George Washington bridge: Construction of substructure
Engineering Index Backfile | 1933
|George Washington bridge: Construction of substructure
Engineering Index Backfile | 1933
|Bridge substructure integral pouring construction method
European Patent Office | 2024
|