A platform for research: civil engineering, architecture and urbanism
Hydraulic fill construction of Huffman Dam
Deficiency of fine material for core supplied by excavating hillside with monitor and sluicing it to core pool at minimum cost.
Hydraulic fill construction of Huffman Dam
Deficiency of fine material for core supplied by excavating hillside with monitor and sluicing it to core pool at minimum cost.
Hydraulic fill construction of Huffman Dam
Public Works
Public Works ; 49
1920
3 pages
1 Fig.
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Shrinkage of hydraulic fill for Huffman dam
Engineering Index Backfile | 1927
|Construction of hydraulic fill road embankment
Engineering Index Backfile | 1926
Discussion of Hydraulic-Fill Dam Construction
ASCE | 2021
|Hydraulic-fill levee construction on the Mississippi
Engineering Index Backfile | 1930
|Recent practice in hydraulic-fill dam construction
Engineering Index Backfile | 1906
|