A platform for research: civil engineering, architecture and urbanism
Hydraulic-fill levee construction on the Mississippi
July 17 n 3 p 84-87: Study of dredge design and equipment, behavior of delta soils, water supply to inshore pits, maneuvering dredge between river and pit and design of levees for economical hydraulic-fill construction based on two years' levee work in middle delta region; maintaining flotation in dredge pool; proposed improved method of hydraulic-fill levee construction. July 24 n 4 p 131-132: Pipe-line practice; flexible ball joints in discharge pipe lines. (See also - discussion by O. P. Erickson, no. 11, Sept. 11, 1930, p. 430)
Hydraulic-fill levee construction on the Mississippi
July 17 n 3 p 84-87: Study of dredge design and equipment, behavior of delta soils, water supply to inshore pits, maneuvering dredge between river and pit and design of levees for economical hydraulic-fill construction based on two years' levee work in middle delta region; maintaining flotation in dredge pool; proposed improved method of hydraulic-fill levee construction. July 24 n 4 p 131-132: Pipe-line practice; flexible ball joints in discharge pipe lines. (See also - discussion by O. P. Erickson, no. 11, Sept. 11, 1930, p. 430)
Hydraulic-fill levee construction on the Mississippi
Eng. News-Rec
Wilbanks, J.R. (author)
Engineering News-Record ; 105
1930
5 Figs
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Hydraulic levee building on lower Mississippi
Engineering Index Backfile | 1929
|Levee construction along the Mississippi River
Engineering Index Backfile | 1929
|Levee building with hydraulic dredges on the Mississippi
Engineering Index Backfile | 1930
|Construction methods and plant on Mississippi levee construction
Engineering Index Backfile | 1929
|Mississippi river. Developing new methods of levee construction
Engineering Index Backfile | 1928