A platform for research: civil engineering, architecture and urbanism
Method of building concrete tailrace below stone arch bridge foundation level
To keep gravel under grillages from caving in, line of interlocking steel sheet piling was driven on each side of excavation, and as material was dug out, bracing timbers were introduced between two rows of piling.
Method of building concrete tailrace below stone arch bridge foundation level
To keep gravel under grillages from caving in, line of interlocking steel sheet piling was driven on each side of excavation, and as material was dug out, bracing timbers were introduced between two rows of piling.
Method of building concrete tailrace below stone arch bridge foundation level
Eng. Contracting
1920
3 pages
5 Figs.
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Continuous steel girder bridge spans santee-cooper tailrace
Engineering Index Backfile | 1946
|METHOD OF INCREASING SPACE UNDER STONE ARCH BRIDGE AND STONE ARCH BRIDGE
European Patent Office | 2019
|Excavation below arch bridge foundations
Engineering Index Backfile | 1920
Building America's longest concrete-arch bridge
Engineering Index Backfile | 1932