A platform for research: civil engineering, architecture and urbanism
Describes how wide, short-span city bridge over railroad tracks was reconstructed without interrupting traffic. New trusses were temporarily supported by old ones and vice versa. Steel was unloaded and erected by stiff-leg derricks on abutments.
Describes how wide, short-span city bridge over railroad tracks was reconstructed without interrupting traffic. New trusses were temporarily supported by old ones and vice versa. Steel was unloaded and erected by stiff-leg derricks on abutments.
Reconstructing east main street bridge
Public Works
Rochester (author)
Public Works ; 49
1920
5 pages
2 Figs.
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
North Main Street High Level Bridge Rehabilitation
British Library Conference Proceedings | 1994
|Reconstructing dynamited bridge
Engineering Index Backfile | 1931
|Load Testing of the Washington & Main Street Railroad Bridge
British Library Conference Proceedings | 2000
|The main street bridge over the Buffalo belt line
Engineering Index Backfile | 1910
Reconstructing the Manhattan Bridge
ASCE | 2016
|