A platform for research: civil engineering, architecture and urbanism
Wrecked structure at Garland City, Ark., required new 300-ft. center span, which was erected without falsework, and new end post and floor beams in adjacent spans; erection diagram.
Reconstructing dynamited bridge
Eng. News-Rec
Emery, P. (author)
Engineering News-Record ; 107
1931
2 pages
4 Figs.
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Reconstructing covered timber bridge
Engineering Index Backfile | 1963
|Reconstructing Sandbar Ferry Bridge
Engineering Index Backfile | 1932
|Reconstructing the Manhattan Bridge
ASCE | 2016
|Reconstructing Croton aqueduct high bridge
Engineering Index Backfile | 1927
Reconstructing bridge under wartime traffic
Engineering Index Backfile | 1946
|