A platform for research: civil engineering, architecture and urbanism
Outlet works, degray dam, Caddo river, Arkansas
Model investigation of single-tunnel outlet works was concerned with developing stilling basin suitable for high diversion flows and high-energy flood-control releases; 1 to 23 scale model reproduced intake tower, tunnel, stilling basin, and exit channel; slide-gate and cylinder-gate intake tower were tested; stilling basin requiring minimum excavation and providing satisfactory energy dissipation of both diversion and flood-control releases was developed.
Outlet works, degray dam, Caddo river, Arkansas
Model investigation of single-tunnel outlet works was concerned with developing stilling basin suitable for high diversion flows and high-energy flood-control releases; 1 to 23 scale model reproduced intake tower, tunnel, stilling basin, and exit channel; slide-gate and cylinder-gate intake tower were tested; stilling basin requiring minimum excavation and providing satisfactory energy dissipation of both diversion and flood-control releases was developed.
Outlet works, degray dam, Caddo river, Arkansas
U S Waterways Experiment Station -- Tech Report
Bucci, D.R. (author)
1965
90 pages
Report
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Flood control outlet works for Blakely mountain dam Ouachita river, Arkansas
Engineering Index Backfile | 1952