A platform for research: civil engineering, architecture and urbanism
Methods of construction and operation are described by which a record production has been obtained on a slope 5,510 feet long. (1200 w.) (No. 45642 C)
Methods of construction and operation are described by which a record production has been obtained on a slope 5,510 feet long. (1200 w.) (No. 45642 C)
Slope haulage at Sayreton, Alabama
Col Engr
Morris, F.G. (author)
1913
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1916
|Safety in connection with haulage practices in Alabama coal mines
Engineering Index Backfile | 1930
|Locomotive haulage or belt haulage
Tema Archive | 1975
|Engineering Index Backfile | 1932
|