A platform for research: civil engineering, architecture and urbanism
Grover Cleveland tank and tower, Buffalo waterworks
Design and construction of cylindrical, double-shell, reinforced-concrete tower, 121 ft. high, 48 ft. in diam., enclosing steel water tank; inner and outer concrete shells poured continuously from top to bottom between movable forms from working platform; details of forms and of jacks for constructing tower.
Grover Cleveland tank and tower, Buffalo waterworks
Design and construction of cylindrical, double-shell, reinforced-concrete tower, 121 ft. high, 48 ft. in diam., enclosing steel water tank; inner and outer concrete shells poured continuously from top to bottom between movable forms from working platform; details of forms and of jacks for constructing tower.
Grover Cleveland tank and tower, Buffalo waterworks
Eng. News-Rec
Wanzel, F.W. (author)
Engineering News Record ; 102
1929
3 pages
4 Figs.
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
The construction of the new Cleveland waterworks intake
Engineering Index Backfile | 1898
The new waterworks intake tunnel for Cleveland, Ohio
Engineering Index Backfile | 1898
Solar heating experiment on the Grover Cleveland School, Boston, Massachusetts
Tema Archive | 1975
Siward's new water tower of York waterworks Co
Engineering Index Backfile | 1957
Tower Blocks UK: Tower Hamlets London Cleveland Way, Cleveland Estate, Block 3, l44-35.jpg
BASE | 2023
|