A platform for research: civil engineering, architecture and urbanism
The construction of the new Cleveland waterworks intake
Illustrated description of the building of this 9-foot, brick-lined tunnel, 26000-feet long, which presented many difficulties overcome by novel methods of working. (5000 w.)
The construction of the new Cleveland waterworks intake
Illustrated description of the building of this 9-foot, brick-lined tunnel, 26000-feet long, which presented many difficulties overcome by novel methods of working. (5000 w.)
The construction of the new Cleveland waterworks intake
Eng Rec
1898
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
The new waterworks intake tunnel for Cleveland, Ohio
Engineering Index Backfile | 1898
Grover Cleveland tank and tower, Buffalo waterworks
Engineering Index Backfile | 1929
|Tunnel intake for Milwaukee waterworks
Engineering Index Backfile | 1914
|Engineering Index Backfile | 1931
|New waterworks intake saves $1500 annually
Engineering Index Backfile | 1936
|