A platform for research: civil engineering, architecture and urbanism
Building design applied to a boulevard viaduct
Details of design and construction of concrete-enclosed steel viaduct on River-side Drive, at 158th street, 1/4 mi. long, 90 ft. wide, built on curve and on rising grade; 250,000 sq. ft. of floor space under viaduct may be used for Street Cleaning Department garage, materials storage yard, machine shop, and sewage screening plant; cost $2,360,000. See editorial comment on p. 976.
Building design applied to a boulevard viaduct
Details of design and construction of concrete-enclosed steel viaduct on River-side Drive, at 158th street, 1/4 mi. long, 90 ft. wide, built on curve and on rising grade; 250,000 sq. ft. of floor space under viaduct may be used for Street Cleaning Department garage, materials storage yard, machine shop, and sewage screening plant; cost $2,360,000. See editorial comment on p. 976.
Building design applied to a boulevard viaduct
Eng. News-Rec
Engineering News Record ; 102
1929
5 pages
13 Figs.
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Building the concrete viaduct on Jamaica bay boulevard
Engineering Index Backfile | 1924
|Building the concrete viaduct on Jamaica bay boulevard
Engineering Index Backfile | 1924
|The South Park Boulevard viaduct
Engineering Index Backfile | 1923
|The highland boulevard viaduct, Milwaukee
Engineering Index Backfile | 1909
Vom Boulevard Périphérique zum Boulevard Central?
Taylor & Francis Verlag | 2017
|