A platform for research: civil engineering, architecture and urbanism
Building the concrete viaduct on Jamaica bay boulevard
Causeway for heavy automobile traffic has roadway from 36 to 72 ft. wide; discusses causeway, viaduct and bulkhead, concrete cast piles, floor platform, beach channel abutment, causeway construction, pile driving, handling and transporting piles and concreting superstructure. ($3,000,000) (See also Contractors' and Engrs.' Monthly, vol. 8, no. 6, June 1924, pp. 47-52, 4 figs.)
Building the concrete viaduct on Jamaica bay boulevard
Causeway for heavy automobile traffic has roadway from 36 to 72 ft. wide; discusses causeway, viaduct and bulkhead, concrete cast piles, floor platform, beach channel abutment, causeway construction, pile driving, handling and transporting piles and concreting superstructure. ($3,000,000) (See also Contractors' and Engrs.' Monthly, vol. 8, no. 6, June 1924, pp. 47-52, 4 figs.)
Building the concrete viaduct on Jamaica bay boulevard
Good Roads
Skinner, F.W. (author)
Good Roads ; 67
1924
5 Figs.
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Building the concrete viaduct on Jamaica bay boulevard
Engineering Index Backfile | 1924
|Building design applied to a boulevard viaduct
Engineering Index Backfile | 1929
The South Park Boulevard viaduct
Engineering Index Backfile | 1923
|The highland boulevard viaduct, Milwaukee
Engineering Index Backfile | 1909
Special concrete specified for Jamaica Bay Viaduct
Engineering Index Backfile | 1922