A platform for research: civil engineering, architecture and urbanism
Principal features of vehicular tunnel now under construction between Detroit, Mich., and Windsor, Ont.; tunnel is 5135 ft. long between portals, roadway 22 ft. wide, headroom 13 ft. 6 in.; construction methods; ventilation; plan, profile and sections.
Principal features of vehicular tunnel now under construction between Detroit, Mich., and Windsor, Ont.; tunnel is 5135 ft. long between portals, roadway 22 ft. wide, headroom 13 ft. 6 in.; construction methods; ventilation; plan, profile and sections.
Construction of Detroit-Canada tunnel
Can. Engr
Thoresen, S.A. (author)
Canadian Engineer ; 56
1929
4 pages
5 Figs.
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1929
|The Detroit-Canada vehicular tunnel
Engineering Index Backfile | 1929
Detroit and Canada vehicular tunnel
Engineering Index Backfile | 1931
Track construction in the Detroit river tunnel
Engineering Index Backfile | 1910
ASCE | 2021
|