A platform for research: civil engineering, architecture and urbanism
Tunnel driving in the Cumberland mountains
Report on excavation of more than 2,000,000 cu. yd. of material and driving of about 9000 ft. of tunnel on 13.6 mi. of single-track construction for Louisville and Nashville Railroad; details of drilling and mucking, and bench excavation; heavy timbering was required; description of concreting plant.
Tunnel driving in the Cumberland mountains
Report on excavation of more than 2,000,000 cu. yd. of material and driving of about 9000 ft. of tunnel on 13.6 mi. of single-track construction for Louisville and Nashville Railroad; details of drilling and mucking, and bench excavation; heavy timbering was required; description of concreting plant.
Tunnel driving in the Cumberland mountains
Construction Methods
Construction Methods ; 11
1929
4 pages
9 Figs.
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Cumberland Gap Tunnel Pavement Problem
NTIS | 2005
|Cumberland Gap Twin Tunnel Project
British Library Conference Proceedings | 1993
|Driving a power tunnel through the green mountains
Engineering Index Backfile | 1925
|Tunnel instrumentation in Snowy Mountains
Engineering Index Backfile | 1961
|