A platform for research: civil engineering, architecture and urbanism
Instrumentation at 5 sites in 2 tunnels of Snowy Mountains allowed measurements to be made of strain in lining, and water pressure outside lining; description is given of method of instrumentation and is followed by survey of results; it appears that load sharing capacity of rock, even though it may be fissured, is quite appreciable.
Instrumentation at 5 sites in 2 tunnels of Snowy Mountains allowed measurements to be made of strain in lining, and water pressure outside lining; description is given of method of instrumentation and is followed by survey of results; it appears that load sharing capacity of rock, even though it may be fissured, is quite appreciable.
Tunnel instrumentation in Snowy Mountains
Australian J Applied Science
Belin, R.E. (author)
1961
9 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1953
|Engineering Index Backfile | 1958
|Rock bolting speeds snowy mountains project
Engineering Index Backfile | 1958
|SPILLWAYS - Dam safety remediation in the Snowy Mountains
Online Contents | 2006
|