A platform for research: civil engineering, architecture and urbanism
Great Northern breaks records in tunnel project
Description of 7.8-mile tunnel, built at cost of $15,000,000; records broken in tunnelings; tunneling methods; serious water troubles; discharge from west portal, amounting at one time, to 9000 g.p.m.
Great Northern breaks records in tunnel project
Description of 7.8-mile tunnel, built at cost of $15,000,000; records broken in tunnelings; tunneling methods; serious water troubles; discharge from west portal, amounting at one time, to 9000 g.p.m.
Great Northern breaks records in tunnel project
Ry. Age
Railway Age ; 86
1929
4 pages
7 Figs.
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Great Northern tunnel through cascades
Engineering Index Backfile | 1929
|Toronto office-building complex breaks records
Engineering Index Backfile | 1965
|SEAEXPLORER GLIDER BREAKS TWO WORLD RECORDS
British Library Online Contents | 2014
|The Cascade tunnel, Great Northern Ry.
Engineering Index Backfile | 1901
|The cascade tunnel: Great Northern railway
Engineering Index Backfile | 1929