A platform for research: civil engineering, architecture and urbanism
The opening of Piccadilly circus tube station
Description of certain points connected with actual process of building; most protracted and difficult part of this task was diversion of gas mains and sewers; construction of booking hall; steelwork that supports roadways; important materials used in work.
The opening of Piccadilly circus tube station
Description of certain points connected with actual process of building; most protracted and difficult part of this task was diversion of gas mains and sewers; construction of booking hall; steelwork that supports roadways; important materials used in work.
The opening of Piccadilly circus tube station
World Power
World Power ; 11
1929
3 pages
3 Figs.
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
The new Piccadilly circus station
Engineering Index Backfile | 1929
|The new piccadilly circus station
Engineering Index Backfile | 1930
|The new Piccadilly circus station
Engineering Index Backfile | 1929
|The reconstruction of the Piccadilly circus tube railway station, London
Engineering Index Backfile | 1928
London underground completes extensive station at Piccadilly Circus
Engineering Index Backfile | 1929