A platform for research: civil engineering, architecture and urbanism
Design and construction of new station, for traffic exceeding 25 millions per year, including novelty headings for escalator-tunnels and chambers; 18-ft. diam. shaft.; pipe-subway; escalator-tunnel, stairways, footbridges, etc. (see also Engineering, vol. 127, no. 3299, Apr. 5, 1929, pp. 437-438; German abstract in Verkehrstechnik, no. 5, Feb. 1, 1929, p. 71, 1 fig.; and French abstract in Genie Civil, vol. 94, no. 15, Apr. 13, 1929, pp. 357-360, 9 figs)
Design and construction of new station, for traffic exceeding 25 millions per year, including novelty headings for escalator-tunnels and chambers; 18-ft. diam. shaft.; pipe-subway; escalator-tunnel, stairways, footbridges, etc. (see also Engineering, vol. 127, no. 3299, Apr. 5, 1929, pp. 437-438; German abstract in Verkehrstechnik, no. 5, Feb. 1, 1929, p. 71, 1 fig.; and French abstract in Genie Civil, vol. 94, no. 15, Apr. 13, 1929, pp. 357-360, 9 figs)
The new Piccadilly circus station
Instn. Civil Engrs. -- Proc
Hall, H. (author)
1929
25 pages
8 Figs. partly on supp. plates
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
The new piccadilly circus station
Engineering Index Backfile | 1930
|The new Piccadilly circus station
Engineering Index Backfile | 1929
|The opening of Piccadilly circus tube station
Engineering Index Backfile | 1929
London underground completes extensive station at Piccadilly Circus
Engineering Index Backfile | 1929
The reconstruction of the Piccadilly circus tube railway station, London
Engineering Index Backfile | 1928