A platform for research: civil engineering, architecture and urbanism
Organization of a Tennessee highway contractor
Method used in construction of 21-mi. concrete pavement, 18 ft. wide, near Dyersburg, Tenn.; description of well-equipped outfit averaging 1000 ft. per day of standard Tennessee 86-8 pavement with 1637 ft. as best day.
Organization of a Tennessee highway contractor
Method used in construction of 21-mi. concrete pavement, 18 ft. wide, near Dyersburg, Tenn.; description of well-equipped outfit averaging 1000 ft. per day of standard Tennessee 86-8 pavement with 1637 ft. as best day.
Organization of a Tennessee highway contractor
Contractors Engrs. Monthly
1929
3 pages
7 Figs.
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
What organization can do for the highway contractor
Engineering Index Backfile | 1928
|What organization can do for the highway contractor
Engineering Index Backfile | 1928
|The contractor views the highway specification
Engineering Index Backfile | 1928
|Capacity of highway contractor to execute postwar highway program
Engineering Index Backfile | 1944
|The highway contractor and his bill
Engineering Index Backfile | 1928
|