A platform for research: civil engineering, architecture and urbanism
The contractor views the highway specification
Study of existing specifications; contractor's viewpoint is different from engineer's viewpoint; clearness is essential; adequately diversified unit classification of quantities; responsibility of engineer. Abstract of paper presented at 1928 Highway Conference.
The contractor views the highway specification
Study of existing specifications; contractor's viewpoint is different from engineer's viewpoint; clearness is essential; adequately diversified unit classification of quantities; responsibility of engineer. Abstract of paper presented at 1928 Highway Conference.
The contractor views the highway specification
Good Roads
Roberts, H.M. (author)
Good Roads ; 71
1928
3 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Capacity of highway contractor to execute postwar highway program
Engineering Index Backfile | 1944
|The highway contractor and his bill
Engineering Index Backfile | 1928
|Organization of a Tennessee highway contractor
Engineering Index Backfile | 1929
Contractor-built machines pave continuously reinforced highway
Engineering Index Backfile | 1961
Public Highway Contractor Prevails in Productivity Claim
ASCE | 2016
|