A platform for research: civil engineering, architecture and urbanism
Building, designed to handle 3200 passengers per hour, is steel-frame, brickfaced structure with 16-story tower, 80 ft. square, and covers area of about 94,000 sq. ft.; large train concourse is provided; track layout speeds switching; baggage and mail building, car-repair and Pullman-supply facilities. (See also Age vol. 86, no. 20, May 18, 1929 pp. 1147-1153, 5 figs)
Building, designed to handle 3200 passengers per hour, is steel-frame, brickfaced structure with 16-story tower, 80 ft. square, and covers area of about 94,000 sq. ft.; large train concourse is provided; track layout speeds switching; baggage and mail building, car-repair and Pullman-supply facilities. (See also Age vol. 86, no. 20, May 18, 1929 pp. 1147-1153, 5 figs)
New York Central completes new station at Buffalo
Modern Transport
Ry, N.Y. (author)
Modern Transport ; 21
1929
4 Figs.
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
New York Central Completes Grade Separation and Passenger Station Project Within City of Syracuse
Engineering Index Backfile | 1936
Buffalo Harbor, New York (Maintenance)
NTIS | 1972
Buffalo Harbor, New York. (Maintenance)
NTIS | 1971
Proposed relocation of North Entrance Channel, Buffalo Harbor, Buffalo, New York
Engineering Index Backfile | 1960
The Breakwater at Buffalo, New York
ASCE | 2021
|