A platform for research: civil engineering, architecture and urbanism
Avalanche-type of slide removed by steam shovel; slide temporarily controlled by log cribbing; retaining wall holds sidehill fill; method of holding fill in place with piling; casings filled with concrete often used; blasting seldom produces worth-while results; rock loads of little value in preventing slide; drainage believed to be solution of problem.
Avalanche-type of slide removed by steam shovel; slide temporarily controlled by log cribbing; retaining wall holds sidehill fill; method of holding fill in place with piling; casings filled with concrete often used; blasting seldom produces worth-while results; rock loads of little value in preventing slide; drainage believed to be solution of problem.
Stopping landslides on highway fills
Contractors Engrs. Monthly
Ladd, G.E. (author)
1929
7 pages
12 Figs.
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Explosives for settling highway fills
Engineering Index Backfile | 1933
|Explosives for settling highway fills
Engineering Index Backfile | 1933
|Compacting highway fills in California
Engineering Index Backfile | 1935
Water Drainage from Highway Fills
NTIS | 1978
|Water Drainage from Highway Fills
NTIS | 1974
|