A platform for research: civil engineering, architecture and urbanism
Bridge supported upon two main girders 38 ft oa length, 4 ft deep, 1 ft 6 in. wide; bridge floor composed of concrete arched segments 2 in. thick, 5 ft 4 in. long, and 18 in. wide; road is 20 ft between sidewalks which are each 5 ft wide.
Bridge supported upon two main girders 38 ft oa length, 4 ft deep, 1 ft 6 in. wide; bridge floor composed of concrete arched segments 2 in. thick, 5 ft 4 in. long, and 18 in. wide; road is 20 ft between sidewalks which are each 5 ft wide.
Concrete skew bridge over railway
Surveyor
Wilson, W.S. (author)
1952
2 pages
Illustrations
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Reconstruction of 60-ft Skew Railway Bridge
Engineering Index Backfile | 1946
Reconstruction of 60-ft Skew Railway Bridge
Engineering Index Backfile | 1946
Skew bridge of armored concrete
Engineering Index Backfile | 1904
Concrete arch railway bridge over the ulster
Engineering Index Backfile | 1910
|Reinforced-concrete cantilever railway bridge over the sambre
Engineering Index Backfile | 1923
|