A platform for research: civil engineering, architecture and urbanism
The construction plant for Gatun locks and Gatun dam
From a paper presented as a thesis for an advanced degree. Illustrated detailed description of this huge construction plant for the handling of materials. Also editorial. (8500 w.) (No. 21060)
The construction plant for Gatun locks and Gatun dam
From a paper presented as a thesis for an advanced degree. Illustrated detailed description of this huge construction plant for the handling of materials. Also editorial. (8500 w.) (No. 21060)
The construction plant for Gatun locks and Gatun dam
Eng News
Schildhauer, Edward (author) / Lee, Ernest Eugene (author)
1911
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1912
|The construction plant for the Gatun locks of the Panama canal
Engineering Index Backfile | 1909
Engineering Index Backfile | 1917
|Unusual bridge carries traffic across gatun locks
Engineering Index Backfile | 1955
|Building the huge concrete locks at gatun, Panama
Engineering Index Backfile | 1910