A platform for research: civil engineering, architecture and urbanism
The construction plant for the Gatun locks of the Panama canal
Illustrates and describes the more important details and general layout of the plant for the handling of stone, sand and cement, the mixing and placing of the concrete, and the main power station. (3500 w.) (No. 6396)
The construction plant for the Gatun locks of the Panama canal
Illustrates and describes the more important details and general layout of the plant for the handling of stone, sand and cement, the mixing and placing of the concrete, and the main power station. (3500 w.) (No. 6396)
The construction plant for the Gatun locks of the Panama canal
Eng Rec
1909
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
The construction plant for Gatun locks and Gatun dam
Engineering Index Backfile | 1911
|Building the huge concrete locks at gatun, Panama
Engineering Index Backfile | 1910
Seismic Evaluation of Gatun Dam - Panama Canal
British Library Conference Proceedings | 2018
|Hydraulic equipment of the Gatun hydroelectric development, Panama Canal
Engineering Index Backfile | 1914
Engineering Index Backfile | 1912
|