A platform for research: civil engineering, architecture and urbanism
Removable bulkhead for water tunnel
All-steel removable bulkhead installed 116 ft below ground in vertical shaft, protects 13-ft tunnel under construction from water flowing through existing 8-ft tunnel immediately overhead.
Removable bulkhead for water tunnel
All-steel removable bulkhead installed 116 ft below ground in vertical shaft, protects 13-ft tunnel under construction from water flowing through existing 8-ft tunnel immediately overhead.
Removable bulkhead for water tunnel
Eng News-Rec
Engineering News-Record ; 133
1944
4 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
BULKHEAD STUD, BULKHEAD, CONSTRUCTION METHOD OF BULKHEAD, AND MANUFACTURING METHOD OF BULKHEAD STUD
European Patent Office | 2022
|WATER TANK DIVISION BULKHEAD, AND METHOD FOR CONSTRUCTING WATER TANK DIVISION BULKHEAD
European Patent Office | 2020
|Thermohydromechanical Modeling of a Full-Scale Tunnel Sealing Clay Bulkhead
British Library Online Contents | 2006
|