A platform for research: civil engineering, architecture and urbanism
Impounding dam on Muna River
Purpose is to regulate flow of Bogota River, supplying water to "El Charquito" and "El Salto " hydroelectric plants of Bogota Electric Power Co; construction work was in two stages; with water level at 2606.50 m, storage capacity 18 million cu m; with water level at 2.610 m, storage capacity will be doubled; paper deals with 8 parts of construction job.
Impounding dam on Muna River
Purpose is to regulate flow of Bogota River, supplying water to "El Charquito" and "El Salto " hydroelectric plants of Bogota Electric Power Co; construction work was in two stages; with water level at 2606.50 m, storage capacity 18 million cu m; with water level at 2.610 m, storage capacity will be doubled; paper deals with 8 parts of construction job.
Impounding dam on Muna River
Embalse del Rio Muna
Anales de Ingenieria ; 52
1944
9 pages
Article (Journal)
Spanish
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1928
|Bacteria in an Impounding Reservoir
Wiley | 1966
|Irrigation sluices from impounding reservoirs
Engineering Index Backfile