A platform for research: civil engineering, architecture and urbanism
Masonry-faced Dam -- First stage of altus dam completed
Design and construction of dam which will provide storage of 163,000 ac ft for irrigation, flood control and domestic water supply; demolition of old Ambursen dam; foundation cleanup and grouting; concrete materials, manufacturing, handling and placing; masonry handling and placing; river outlet gates.
Masonry-faced Dam -- First stage of altus dam completed
Design and construction of dam which will provide storage of 163,000 ac ft for irrigation, flood control and domestic water supply; demolition of old Ambursen dam; foundation cleanup and grouting; concrete materials, manufacturing, handling and placing; masonry handling and placing; river outlet gates.
Masonry-faced Dam -- First stage of altus dam completed
Western Construction News
Byrne, W.S. (author)
1944
7 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Boynton Williams & Associates Altus High School, Commons Addition Altus, Oklahoma
British Library Online Contents | 2011
Altus dam rebuilt as gravity structure with masonry facing used as forms
Engineering Index Backfile | 1945
|Condition Survey, Altus Air Force Base, Oklahoma
NTIS | 1973
|Stresses in masonry faced steel concrete frameworks
Engineering Index Backfile | 1950
|Investigation of a brick masonry completed in 1895
British Library Conference Proceedings | 1996
|