A platform for research: civil engineering, architecture and urbanism
Tables given for use in design of cross beams where piled substructure is used and permissible loading on piles is such that three or five piles are used in place of four; they will also be of use when for reasons of total span length or architecturally, three spans are undesirable. (See also v 21 n 251 Nov 1943 p 311-4)
Tables given for use in design of cross beams where piled substructure is used and permissible loading on piles is such that three or five piles are used in place of four; they will also be of use when for reasons of total span length or architecturally, three spans are undesirable. (See also v 21 n 251 Nov 1943 p 311-4)
Three span bridges
Roads Road Construction
Dews, N.A. (author)
1944
3 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1944
|Engineering Index Backfile | 1945
|Engineering Index Backfile | 1946
|Engineering Index Backfile | 1934
|Wiley | 2019
|