A platform for research: civil engineering, architecture and urbanism
Building 1,700,000-yd. Fill on airfield at Newport, Oregon
Manner in which difficult conditions are being overcome in constructing airport on unusual site crossed and criss crossed by canyons and gullies; building and compacting fills in wet weather; draining saturated subsoils with 9 mi of drain tile; transporting tractors and shovels from one working area to another by trailer; rebuilding and repairing equipment on job; crushing plant of Rogers Construction Co.
Building 1,700,000-yd. Fill on airfield at Newport, Oregon
Manner in which difficult conditions are being overcome in constructing airport on unusual site crossed and criss crossed by canyons and gullies; building and compacting fills in wet weather; draining saturated subsoils with 9 mi of drain tile; transporting tractors and shovels from one working area to another by trailer; rebuilding and repairing equipment on job; crushing plant of Rogers Construction Co.
Building 1,700,000-yd. Fill on airfield at Newport, Oregon
Pac Bldr Engr
1944
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Compacted Fill of an Airfield Pavement
British Library Online Contents | 1997
|Pipeline two miles long delivers sand fill to airfield
Engineering Index Backfile | 1958
Building fighter airfield in Italy
Engineering Index Backfile | 1944
|