A platform for research: civil engineering, architecture and urbanism
Fast work is feature of Buffalo winter construction
Large 8-story reinforced-concrete and brick building closed in less than 3 months in midwinter. Notes on methods employed. Old structure used as part of housing; unusual formwork.
Fast work is feature of Buffalo winter construction
Large 8-story reinforced-concrete and brick building closed in less than 3 months in midwinter. Notes on methods employed. Old structure used as part of housing; unusual formwork.
Fast work is feature of Buffalo winter construction
Eng. News-Rec
1924
4 pages
7 Figs.
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Buffalo Airport winter maintenance
Engineering Index Backfile | 1945
|Engineering Index Backfile | 1900
Winter construction provides work relief
Engineering Index Backfile | 1932
Construction of Buffalo-Fort Erie bridge
Engineering Index Backfile | 1927
Underground construction of the Buffalo Railway Company
Engineering Index Backfile | 1892
|