A platform for research: civil engineering, architecture and urbanism
Driving 250-ft. Piles for Hudson River tunnel shaft
Footings for vehicle-tunnel shafts consist of 24-in. pipes driven 250 ft. to rock, filled with concrete and cut off 70 ft. below bottom of river.
Driving 250-ft. Piles for Hudson River tunnel shaft
Footings for vehicle-tunnel shafts consist of 24-in. pipes driven 250 ft. to rock, filled with concrete and cut off 70 ft. below bottom of river.
Driving 250-ft. Piles for Hudson River tunnel shaft
Eng. News-Rec.
1923
7 pages
21 Figs.
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Steel cofferdam for a Hudson river tunnel shaft
Engineering Index Backfile | 1906
Engineering Index Backfile | 1882
|Engineering Index Backfile | 1889
ASCE | 2021
|ASCE | 2021
|