A platform for research: civil engineering, architecture and urbanism
The fully hydroelectric plant
Makes use of head of 1650 m.; discusses water-storage problem for use during winter, and civil-engineering work connected with it; construction of barrage dam; water intake; weirs; sluice gates and their hydraulic control; pumping stations; pressure piping; turbines; regulators, etc. (See also - vol. 49 no. 1 Jan. 6 pp. 2-7, vol. 49 no. 2 Jan. 20 pp. 14-18, vol. 48 no. 21 Oct. 14 1922 pp 241-248, vol. 48 no. 22 Oct. 28 1922 pp. 253-256, vol. 48 no. 23 Nov. 11 1922 pp. 265-271, vol. 48 no. 24 Nov. 25 1922 pp. 279-284, vol. 48 no. 26 Dec 23 1922 pp. 301-304)
The fully hydroelectric plant
Makes use of head of 1650 m.; discusses water-storage problem for use during winter, and civil-engineering work connected with it; construction of barrage dam; water intake; weirs; sluice gates and their hydraulic control; pumping stations; pressure piping; turbines; regulators, etc. (See also - vol. 49 no. 1 Jan. 6 pp. 2-7, vol. 49 no. 2 Jan. 20 pp. 14-18, vol. 48 no. 21 Oct. 14 1922 pp 241-248, vol. 48 no. 22 Oct. 28 1922 pp. 253-256, vol. 48 no. 23 Nov. 11 1922 pp. 265-271, vol. 48 no. 24 Nov. 25 1922 pp. 279-284, vol. 48 no. 26 Dec 23 1922 pp. 301-304)
The fully hydroelectric plant
Usine hydroelectrique de Fully
Chenaud, H. (author) / Du Bois, L. (author)
1923
6 pages
48 Figs.
Article (Journal)
French
© Metadata Copyright Elsevier B. V. All rights reserved.
The hydroelectric plant of fully (Switzerland)
Engineering Index Backfile | 1921
|Schluchsee Hydroelectric Plant
Engineering Index Backfile | 1930
|Hydroelectric plant of fully (valais, Switzerland) Using a Head of 1,650 m.
Engineering Index Backfile | 1922
|