A platform for research: civil engineering, architecture and urbanism
Calaveras dam raised with dry fill and puddled core
Additional material now being added brings total height to 175 ft.; concrete spillway and new outlet tunnel provided.
Calaveras dam raised with dry fill and puddled core
Additional material now being added brings total height to 175 ft.; concrete spillway and new outlet tunnel provided.
Calaveras dam raised with dry fill and puddled core
Eng. News-Rec
1923
2 pages
3 Figs.
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Calaveras hydraulic fill earth dam
Engineering Index Backfile | 1917
|Reconstructing the Calaveras dam by dry fill
Engineering Index Backfile | 1926
|Engineering Index Backfile | 1929
|Calaveras cement company adds third kiln
Engineering Index Backfile | 1946