A platform for research: civil engineering, architecture and urbanism
Reconstructing the Calaveras dam by dry fill
Dryfill substituted for hydraulic fill in dam of Spring Valley Water Co., San Francisco, after slip of 1918; dam is now 220 ft. high with provision for ultimate height of 255 ft.
Reconstructing the Calaveras dam by dry fill
Dryfill substituted for hydraulic fill in dam of Spring Valley Water Co., San Francisco, after slip of 1918; dam is now 220 ft. high with provision for ultimate height of 255 ft.
Reconstructing the Calaveras dam by dry fill
Eng. News-Rec
Elliott, G.A. (author)
1926
4 pages
4 Figs.
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Calaveras hydraulic fill earth dam
Engineering Index Backfile | 1917
|Calaveras dam raised with dry fill and puddled core
Engineering Index Backfile | 1923
Engineering Index Backfile | 1929
|Calaveras cement company adds third kiln
Engineering Index Backfile | 1946
Failure of part of the Calaveras dam
Engineering Index Backfile | 1918