A platform for research: civil engineering, architecture and urbanism
The wrecking and reconstruction of a railway bridge over the Rhine-Herne canal
Wrecking a truss bridge by blasting bottom-boom junctions of both main girders; behavior of bridge after blast one of main girders; reconstruction of bridge without auxiliary scaffold; measurements of deflection.
The wrecking and reconstruction of a railway bridge over the Rhine-Herne canal
Wrecking a truss bridge by blasting bottom-boom junctions of both main girders; behavior of bridge after blast one of main girders; reconstruction of bridge without auxiliary scaffold; measurements of deflection.
The wrecking and reconstruction of a railway bridge over the Rhine-Herne canal
Sprengung und Wiederherstellung der Eisenbahnbrucke uber den Rhein-Herne-Kanal zur Zeche Nordstern
Ehrlich, H. (author)
Bauingenieur ; 4
1923
5 pages
10 Figs.
Article (Journal)
German
© Metadata Copyright Elsevier B. V. All rights reserved.
Rolling into position a railway bridge over the Rhine-Herne canal
Engineering Index Backfile | 1926
Engineering Index Backfile | 1928
|Wrecking of old railroad bridge over Rhine river at Duisburg-Hochfeld
Engineering Index Backfile | 1929
|Asphalt grouting as protection of slope of Rhine-Herne canal
Engineering Index Backfile | 1955
|Electrical equipment of the canal locks on the Rhine at Herne
Engineering Index Backfile | 1921
|