A platform for research: civil engineering, architecture and urbanism
Rolling into position a railway bridge over the Rhine-Herne canal
Describes operation of rolling a lattice-girder bridge assembled on shore into position over track at 90 deg. to canal; span between supports, 60 m.; main girder span, 4.8 m.; total weight, 228 tons.
Rolling into position a railway bridge over the Rhine-Herne canal
Describes operation of rolling a lattice-girder bridge assembled on shore into position over track at 90 deg. to canal; span between supports, 60 m.; main girder span, 4.8 m.; total weight, 228 tons.
Rolling into position a railway bridge over the Rhine-Herne canal
Montage einer Eisenbahnbrucke uber den Rhein-Herne-Kanal durch Ueberschieben
Bautechnik ; 4
1926
3 pages
5 Figs.
Article (Journal)
German
© Metadata Copyright Elsevier B. V. All rights reserved.
The wrecking and reconstruction of a railway bridge over the Rhine-Herne canal
Engineering Index Backfile | 1923
|Engineering Index Backfile | 1928
|Asphalt grouting as protection of slope of Rhine-Herne canal
Engineering Index Backfile | 1955
|Electrical equipment of the canal locks on the Rhine at Herne
Engineering Index Backfile | 1921
|Ports of Rhine-Herne Canal subject to effects of mining operations
Engineering Index Backfile | 1966
|