A platform for research: civil engineering, architecture and urbanism
Building Brooklyn bridge pier
933 reinforced-concrete piles cast in double tiers, cured, waterproofed and transported without any cracks; reinforcement bars bent by hand; economical method of assembling; piles driven with steam hammer, twin hydraulic jets and special follower.
Building Brooklyn bridge pier
933 reinforced-concrete piles cast in double tiers, cured, waterproofed and transported without any cracks; reinforcement bars bent by hand; economical method of assembling; piles driven with steam hammer, twin hydraulic jets and special follower.
Building Brooklyn bridge pier
Pub. Works
Public Works ; 53
1922
3 pages
3 Figs.
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1888
|TIBKAT | 1979
|Wiley | 1984
|Construction method for bridge pier building and device for assisting bridge pier building
European Patent Office | 2023
|Engineering Index Backfile | 1897