A platform for research: civil engineering, architecture and urbanism
Breakwater construction, Toronto island shore
Formation of Toronto Island; early protection work; describes rubble-mound breakwater founded on mattresses; mattress sections 100 by 60 by 3 ft. thick; stone for mound subjected to frost test; abstract of specifications. See also Eng. and Contracting (Water Works), vol. 59, no. 5, May 9, 1923, pp. 1044-1046, 2 figs.
Breakwater construction, Toronto island shore
Formation of Toronto Island; early protection work; describes rubble-mound breakwater founded on mattresses; mattress sections 100 by 60 by 3 ft. thick; stone for mound subjected to frost test; abstract of specifications. See also Eng. and Contracting (Water Works), vol. 59, no. 5, May 9, 1923, pp. 1044-1046, 2 figs.
Breakwater construction, Toronto island shore
Can. Engr
Wilson, John M. (author)
Canadian Engineer ; 44
1923
4 pages
5 Figs.
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Rapid progress on Toronto breakwater
Engineering Index Backfile | 1923
Modeling of Shore-Line Changes due to Construction of Breakwater
British Library Conference Proceedings | 1999
|Shore protection by horizontal pipe breakwater
British Library Conference Proceedings | 2000
|Making concrete blocks for Toronto breakwater
Engineering Index Backfile | 1919
|Diffraction of Waves by Shore-Connected Breakwater
ASCE | 2021
|