A platform for research: civil engineering, architecture and urbanism
Rapid progress on Toronto breakwater
Further details of piece of marine construction protecting 3 1/2 miles of shore; consists of pre-cast concrete blocks on rock filled cribs, capped with mass concrete.
Rapid progress on Toronto breakwater
Further details of piece of marine construction protecting 3 1/2 miles of shore; consists of pre-cast concrete blocks on rock filled cribs, capped with mass concrete.
Rapid progress on Toronto breakwater
Contract Rec. Eng. Rev
1923
5 pages
14 Figs.
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Breakwater construction, Toronto island shore
Engineering Index Backfile | 1923
|Making concrete blocks for Toronto breakwater
Engineering Index Backfile | 1919
|Toronto breakwater to curb 10-foot waves
Engineering Index Backfile | 1914
Engineering Index Backfile | 1962