A platform for research: civil engineering, architecture and urbanism
Describes four new steel tanks with concrete hopper bottoms, of 4500 tons capacity, for secondary ore storage, built at Timber Butte mill, Butte, Mont.
Describes four new steel tanks with concrete hopper bottoms, of 4500 tons capacity, for secondary ore storage, built at Timber Butte mill, Butte, Mont.
New timber Butte bins
Eng. Min. Jl. -- Press
Tait, W.J. (author)
1923
2 pages
4 Figs.
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Partial failure of Timber dam near Butte, Mont
Engineering Index Backfile | 1898
|Timber framing mills in the Butte district, Mont.
Engineering Index Backfile | 1913
|Construction of timber headframes in the Butte district
Engineering Index Backfile | 1930
|Designing wooden ore bins with timber connectors
Engineering Index Backfile | 1939
|