A platform for research: civil engineering, architecture and urbanism
Project in California will develop 128,000 kw in 2-unit underground plant; excavation methods and progress data are given; other major features are: 290 ft high concrete face rockfill dam, underground free discharge valve installation for dam outlet works, underground power tunnel intake valve, etc.
Project in California will develop 128,000 kw in 2-unit underground plant; excavation methods and progress data are given; other major features are: 290 ft high concrete face rockfill dam, underground free discharge valve installation for dam outlet works, underground power tunnel intake valve, etc.
Haas hydroelectric power project
ASCE -- Proc (J Power Div)
Cooke, J.B. (author)
1958
40 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Haas Hydroelectric Power Project
ASCE | 2021
|Engineering Index Backfile | 1961
|Petenwell hydroelectric project
Engineering Index Backfile | 1951
|Engineering Index Backfile | 1955
|Engineering Index Backfile | 1960
|